TELEDRONE
Building the flying p̶h̶o̶n̶e̶-̶b̶o̶o̶t̶h̶ boat!
Saturday, November 19, 2022
Half-Scale Build #8
With the centre-section secured in situ with the uppermost capping-sheet of 1.2mm aluminium, remove it so as to allow the perimeter frame to be drilled from around the sides and at the point pencilled earlier on the topsides of the tubular sections.
Newer Post
Older Post
Home