What though are the takeaways from Phase One of the build?

(a)    We've too much buoyancy and can revert to 20mm foam panels instead of 25mm

(b)    Ditto, so we can lower the deck back to amidships where it will assist level trim

(c)    The bar up front can come off pending fitment of lift motors

(d)    All wooden spars can be sourced locally as they are all sub 2.40m (eight feet)