Monday, December 12, 2022

Half-Scale Build #79


With sub-zero temperatures in the workshop some elements of the build have to be conducted indoors, where I've set the temperature to a balmy 14°C. I've also recalled Monty to test-flying duties, which he gracefully acceded to.

He has insisted on a number of conditions, one being the restoration of a flight-deck-come safety restraint. He also requires a dual side-stick option, which will involve an extension to the front half of the restraint. This time however we shall retain it inside the outline of the transporter (aka phone-box), as it makes for easier handling beside providing the opportunity for all-round glazing.

I've used two lengths of sixteenth-inch angle alloy with cut-outs to accommodate the columns, at the same time countersinking the 9mm ply in order to accept 12mm rivet.